Case studies : Regional Distribution Centre


Air Handling units for Retail installation - Argos
Client name: Argos
Location : Barton under Needwood

Type of installation : Regional Distribution Centre

Required spec:

30m high bay area
fast track installation programme
maintenance free operating space

Argos choose JetAHUDetails:

Employed directly by main contractor Norwest Holst, the project comprises of four areas of differing requirements:

Densely racked high bay area with an average height of 30m

low bay area comprising receiving/despatch

low bay racking

two level mezzanine with a height of 6m each. The design criteria is for frost protection at 10C within the unmanned high bay with the receiving/despatch and low bay being controlled at 16C whilst the mezzanine area will be controlled at a slightly higher temperature of 18C. All plants are designed to operate with a minimum of 10% fresh air in the winter with the capability of supplying 100% fresh air in the summer. Complete August 2002