Installation types :

Heating types :

 

Case studies : Train Maintenance


Air Handling units for Train maintenance installation - Bombardier
Client name: Bombardier
Location : Wakefield

Type of installation : Train Maintenance

Required spec:

Air quality sensors
Free summer cooling
Oil fired AHU
Temporary structure

Bombardier choose JetAHUDetails:

Working very closely with the M&E contractor, Gradwood, JET developed an effective solution to meet the very specific requirements of Bomardierís train commission sheds at Crofton in Wakefield. The sheds, which are only temporary, have the added difficulties of an inflatable roof and sunken maintenance pits for access to the underside of trains. JET developed a stand alone system with its own controls that could be dismantled and reconstructed when the building moved. An oil fired air handling unit was located outside to maximise the internal operational space. The building is continuously monitored for air quality with the system purging exhaust fumes and providing free summer cooling. The success of phase 1 resulted in JET being uniquely specified for phase 2 which required the integration of the first facility with the second commissioning facility.

Client website :
http://www.bombardier.com

Click here to print this case study
< Previous page